Green Meter Price in Pakistan — October 2025 Update (Net-Metering Cost, Fees & Packages)
Quick answer: In October 2025, a complete home green meter setup in Pakistan typically lands around Rs. 120,000 when bought as an all-inclusive bundle (meter + basic cabling + documentation). If you buy the meter only, expect to add registration/approvals, cabling, and labour—so your final bill can climb higher depending on city and DISCO.
What Changed in October 2025?
Prices for net-metering (“green”) meters eased this month, making it simpler for households and small businesses to send surplus solar power to the grid and cut electricity bills.
Current Green Meter Prices (October 2025)
All-inclusive bundle (most common for homes)
-
Typical outlay: ≈ Rs. 120,000
Includes meter, standard three-phase cable, paperwork & installation for a straightforward site.
Final price varies by city, meter spec, and vendor margins.
Device-only (no paperwork/labour):
-
Single-phase meter: ≈ Rs. 130,000
-
Three-phase meter: ≈ Rs. 90,000
These are the device rates—add fees below if you arrange the rest yourself.
Cost Breakdown (reference guide)
-
Green meter device: ~Rs. 40,000 (varies by type/brand)
-
Three-phase cable & accessories: ~Rs. 10,000
-
Paperwork & govt./DISCO fees: ~Rs. 35,000
-
Estimated all-in total (simple case): ≈ Rs. 120,000
If you purchase only the meter, additional services usually add ≈ Rs. 90,000–105,000 depending on your location and the scope of work (engineering visit, wiring changes, approvals, meter testing, and activation).
Extra Charges You Might See
-
Net-metering registration with your DISCO (WAPDA)
-
Site inspection, design & interconnection approval
-
Labour & technical installation (panel to inverter to meter board)
-
Upgrades (breaker box, earthing, surge protection if required)
Not every home needs all of the above. Always request a written quote that separates device, paperwork, and labour.
Solar System Package Prices (October 2025)
-
3 kW (small homes): ~ Rs. 510,000
-
5 kW (medium homes): ~ Rs. 810,000
-
10 kW (large homes/offices): ~ Rs. 1.4–1.6 million
Packages typically include panels, inverter, mounting structure, standard BOS items, and installation. Batteries are usually optional.
Why Install a Green Meter in 2025?
-
Lower bills: Export surplus solar to the grid and offset your units.
-
Faster payback: High grid tariffs make net-metering credits valuable.
-
Energy independence: Less reliance on peak-hour grid rates.
-
Environment-friendly: Clean generation with measurable impact.
Documents Usually Required
-
CNIC copy of the owner
-
Latest electricity bill and consumer number
-
Proof of ownership/authorization (if the meter is not in your name)
-
Solar system details (capacity, inverter make/model, single/three-phase)
How to Get the Best Price (and Avoid Delays)
-
Ask for two quotes from reputable EPCs: (a) meter + paperwork only, (b) full turnkey.
-
Confirm what “all-inclusive” means—does it cover DISCO application, testing, and activation?
-
Check timelines—approval and commissioning can take 2–6 weeks depending on workload.
-
Verify meter compatibility with your inverter and phase (single/three).
-
Get receipts for every fee paid to government/utility.
FAQs
What is a “green meter”?
It’s a bi-directional meter for net-metering. It records electricity you draw from the grid and the surplus you export from solar, so you’re billed on the net.
Is net-metering available everywhere?
Coverage is expanding, but processes differ by DISCO (e.g., LESCO, MEPCO, FESCO, etc.). Check your local utility’s latest rules.
How long does installation take?
After site readiness, paperwork + DISCO testing + meter activation can take 2–6 weeks in most cities.
Will my old single-phase connection work?
Many homes upgrade to three-phase for larger solar systems. Ask your EPC which option suits your load and inverter size.
Bottom Line (October 2025)
If you choose a turnkey package, most households are seeing around Rs. 120,000 for the complete green meter job in October 2025. Buying the device only is possible, but by the time you add registration, approvals, and labour, your total can end up similar—or higher—than a bundled service. Get itemized quotes, confirm timelines, and always verify charges with your DISCO.